How to Install Namgrass

OK! You’ve decided to replace that patchy, worn-out old lawn with a broad swathe of beautifully lush Namgrass. That’s great. Now, whether you handle this as a DIY project or you get someone in, careful planning and preparation will pay off handsomely in the end. Spending time on basics like a smooth, level surface is important if you are going to get a result to be proud of. The below instructions are our recommended installation process for ideal conditions.  There are other ways to install which can be dependant on materials available and ground conditions but do give us a call if you’re unsure. Let’s get started!

Step 1 Preparing the Area

First you need to remove all the old turf. If you have an area larger than a few square metres, it’s worth hiring a turf cutter. It will make the job much quicker and easier and it helps take the hassle out of achieving a level surface.

Step 2 Fitting the Edge

To enhance its good looks for years to come, Namgrass should have neat, durable edge around it. When choosing which material to use (timber, metal, concrete or brick) remember Namgrass is available in pile heights from 10mm to 45mm deep, so you should lay the height of your edge accordingly. Next, have a nice cup of tea.

Step 3 Laying the Base

Once the edge is in place, the entire area needs to be covered with a layer of fine aggregate such as ‘Grano dust’, ‘Dust’ or ‘Fine Type 1’. Your local builders merchant will be able to advise and supply, but particles should be no bigger than 5mm. Take along your measurements, including the depth, so they can calculate the quantity.  

 

Next, another trip to the hire shop for a compacter which is needed to compress the material and provide a firm base. Continue to add the fine aggregate and keep compacting until the layer is between 40-60mm deep. And, depending on which Namgrass you choose, keep the base layer roughly 20mm below the top of your edging. Remember to form a slight camber so the base slopes towards the edges, this will help accommodate any settlement over time.  

 

It’s a good idea to spray the area with water to keep the dust down and help the aggregate to bind. Then it’s time for another cup of tea. Finally, (phew!) cover the base layer with a weed membrane, pinning it close up to the edging.

Step 4 Installing Namgrass

Now for the fun part! Lay the Namgrass over the area and overlap the edges so you have enough material to trim for a close finish. Chances are, you’ll need to join two or more pieces together, roll these pieces out as well, ensuring the pile runs the same way. Leave the Namgrass to settle for a couple of hours. Break for lunch.

Come on, come on, back to work. Carefully cut the overlapping edges, sharp knife essential, so they fit snugly up to your edging. Whilst it’s not essential, you can infill artificial grass products with an even layer of kiln dried sand – approx. 5 kilos/m2. This provides additional stability and weight to the product, thus making for a much nicer completed project. After spreading the sand, brush up the grass to lift the pile and settle the sand in. More tea.

If you are a pet owner we suggest not infilling with sand to ensure a lawn that smells fresher for longer.

 

How to Join Two Lengths Together

Depending on the size and shape of your garden you may well need to join Two sections together. Our top tip here is to take your time. its simple to do, get it right and you’ll never know there is a join, but get it wrong and you will see it. To make sure you get a professional finish Follow these simple instructions.

man cutting latex backing

Step 1 Cutting the Lengths

Line up the two lengths ensuring the pile runs in the same direction. Fold back the edges of the first length and locate the third and fourth rows of stitching. Using a sharp knife (change the blade it will be blunt by now), cut through the latex, between the rows of stitching, all the way along. Take care not to cut the blades of grass. Remove the excess strips and repeat the process on the other length. Time for tea, and have a Hob-Nob too, you’ve earned it.

Step 2 Joining the lengths

Line up the cut lengths and fold back the edges, holding them back all along the join. Roll out the joining tape, shiny side down, on the ground between the two lengths of Namgrass. Use a cartridge gun (and spreader if you like) to apply the adhesive evenly along the tape. Starting at one end, fold the two lengths of Namgrass back over so they stick to the tape. Take care not to get grass fibres stuck in the glue. Not long now, think of all the grass cutting you won’t have to do! Once both edges are folded over, walk gently along the joint to firm it down. If you can see the join, make small adjustments until it disappears. Leave at least two hours for the glue to go off, or up to a day if it is below freezing.

Step 3 Opening the Bottle

Well done! Celebrate by selling your old lawnmower and opening a bottle of bubbly!